The selected Santa Fe CM oil cooler is the 2.4L G4KE petrol version, supplied with the pictured sealing gasket. A Santa Fe or CM badge alone does not establish the diesel application or a different sealing arrangement.
Use the engine record first, then compare the original cooler’s centre bore, circular sealing face and hose connections. The gasket shown belongs to the selected package; it is not evidence of universal CM fitment.
Confirm petrol engine and build scope
The selected G4KE cooler with gasket covers the listed Australian 2.4L petrol application built 11/2009–09/2012. Reference 26410-2G000 replaces the earlier 26410-25402 in the product record.
This does not replace the D4HB 2.2L diesel cooler. Keep the VIN, actual build month, engine code and original reference with the enquiry; registration year alone leaves important identifiers out.
Compare the centre bore and sealing face

The mechanical oil-to-coolant heat exchanger has two hose connections and a central mounting bore. Align the original and replacement in corresponding views, then compare outlet positions, bore and seal arrangement.
A circular face that looks similar is only one observation. Do not infer bore dimensions or the gasket’s service specification from photograph scale. Ask for the missing detail if a mounting or connection feature is hidden.
Separate the included gasket from other service items
The package contains one cooler with the pictured sealing gasket. Oil filter, hoses and mounting hardware are excluded. Have the installer confirm any further parts and the correct fitting requirements for the diagnosed repair.
This is an engine-oil heat exchanger, not an EGR cooler. A cooling-system or oil complaint needs diagnosis before selecting a component; the package description does not establish a fault location.
Send the original-unit details together
Provide the VIN, build month, G4KE identification, original number and accessible photographs of the complete cooler, centre bore, seal face and both hose connections. Identify any difference before ordering and keep the sealing requirements with the installer’s repair plan.
Prepared from application records and the linked product photographs. The featured workshop scene is an AI-generated editorial illustration. Information reviewed on 3 November 2026.
